WDHG-103 automatic low calibrating height type voltage transformer field tester has both low calibrating height method to measure voltage transformer error and potential difference method to measure voltage transformer error, which is convenient to carry out on-site calibration of metering devices.
1. Low calibration high voltage transformer error measurement part
1) Machine accuracy: 1 / 3 of the error limit of the inspected voltage transformer
2) test specification:
6KV/100V | 10KV/100V | 20KV/100V | 35KV/100V |
6KV/√3/100V/√3 | 10KV/√3/100V/√3 | 20KV/√3/100V/√3 | 35KV/√3/100V/√3 |
66KV/√3/100V/√3 | 110KV/√3/100V/√3 | 220KV/√3/100V/√3 |
1) Operating range of the inspected voltage transformer: 80%~120%
2) Secondary load: 0.0VA~300VA, COS =0.1~1.0
3) Accuracy range of the voltage transformer inspected: 1.0,0.5,0.2, and 0.1
4) Resistance and conductor measurement error is 5.0%
5) measuring range:
R:0.00Ω~5.0Ω
Y:0.000mS~200.0mS
2. Voltage transformer tester section
1) cophase component:
DX= ± (X 2% + Y 2% ±, 2 words)
DY= ± (X 2% + Y 2% ± in 5 words)
Display values of the "X", "Y" —— instruments
Quantization error of the "5-word" —— instrument
2) Percent table: Level 1
3) measuring range:
f:0.0000%~200.0%
δ:0.000′~999.9′
4) Rated operating voltage: 100 / 3V, 100 / 3V, and 100V
5) Operating range of the tested voltage transformer: 20%~200%
3. Power consumption of the instrument: 20VA
4. Instrument accuracy level: 0.05
Email:info@wgdchipot.com
Whatsapp: +86 13657267902
Skype: sallyliao2006
Wechat:sallyliao ( 13657267902)
Tel:+86 13657267902
Address:13 / F, Building 2, Hangang Science and Technology Industrial Park, Jintan Road, Wuhan, Hubei, China.